Invitation for Proposals-Ministry of Water Supply and Sanitation

August 3, 2017 | 534 views | N/A

NOTICE OVERVIEW

Government of Nepal

Ministry of Water Supply and Sanitation

Invitation for Proposals to Engage on Design Build Operation & Transfer (DBOT) Models Regarding Water & Waste Water Facilities in Nepal
| Section 1 Introduction
Ministry of Water Supply and Sanitation Government of Nepal, intends to receive the proposals from the interested parties for design implementation and operation (including total financing) of water & waste water facilities in Kathmandu and Municipalities of Nepal from National or International Public or Private Companies.
Interested parties are invited to submit their response in accordance with section 2 (instructions). A submittal of a
response by the parties serves as notice to Ministry of Water Supply and Sanitation of their general interest. However, a submittal of response does not guarantee that the interested party will be contacted to submit a proposal for services
or perform any service.

I Section 2 Instructions

2.1 Submittal Deadline
Response from the interested parties must be received by email or submitted in person no later than 16th August,  2017, 5.00 PM local time. Late submittals will be considered at the discretion of the Ministry of Water Supply 1
and Sanitation.
2.2 Protocol for Submission of Submitter and Required Documents
All submittals must be prepared in English language and submitted in sealed envelope (not applicable in case of submission by email).

All documents must be submitted in person or by email to info@kvwsmb.org.np (in PDF form) or by mail to the

following address: Executive Director
Kathmandu Valley Water Supply Management Board. Thapathali, Kathmandu Attention to: Sanjeev Bickram Rana
Each respondent must submit their company profile with financial capabilities and experiences (specially on the 1 related field).
Section 3 Scope of work
1 Scope of work includes all kinds of works related to the water and waste water infrastructure development and operation 1 with financing. These works shall be carried out based on the models of PPP like BOT. BOOT, BROT. DBFO. DBO 1
etc. The following (but not limited to) are considered as the scope of works:
S.N. Description Type Geographical location Sector Remarks
New Rehabilitation Expansion Kathmandu

Valley

Other

Municipalities or Towns

Water Waste

Water

a. Service Area v/ v/ v/ n/ v’ v’ >/
b. Distribution

Networks

v/ v’ n/ v/ s/ V” v/
c. Treatment Plants v/ v/ v” V v/
d. Fecal Sludge Management v’ X X v’ V X
c. Decentralized
Waste Water v/ X X V X v/
Treatment Plants
f. SCADA v/ X X v’ V v/ v/
1 Respondents can choose the particular scope of work in their respected fields according to their capacities 1
| and experiences. 1

 